Well yesterday I started the demo of our hallway bath. I got the toilet, vanity, and flooring out. The flooring had tile, cement board, and under that was linoleum. The wood panels have black around the tub and the toilet so it looks like I need to replace those sections. I was hoping to have my dumpster here yesterday but it didn’t arrive. Hopefully today.
The plan for today is to get the tub out and plumbed. Also take out the ceiling and possibly getting it replaced. It would be a good day if I got that far as I have blown in insulation in the attic so it needs to be moved first.
Yesterday I also go more done on the vanity. I got the face frame put together as well as the slots in the doors/drawers to accept the plywood.
[External image (uploads.tapatalk-cdn.com), not copied]
[External image (uploads.tapatalk-cdn.com), not copied]
[External image (uploads.tapatalk-cdn.com), not copied]
[External image (uploads.tapatalk-cdn.com), not copied]
[External image (uploads.tapatalk-cdn.com), not copied]
Sent from my XT1254 using Tapatalk
[External image (uploads.tapatalk-cdn.com), not copied]
[External image (uploads.tapatalk-cdn.com), not copied]
[External image (uploads.tapatalk-cdn.com), not copied]
[External image (uploads.tapatalk-cdn.com), not copied]
Sent from my XT1254 using Tapatalk
Well made some progress the last two days. My dumpster finally arrived today. Able to get the room completely gutted. I got the new shower faucet installed. Still need to put in the supports though. With the master bath next to this room I was able to switch out the drain for a new push lock one. The master tub wouldn’t hold water anymore. Wife works tomorrow so I’ll be home with the kids. Hopefully I can get a friend over to get the drywall in. Had to put in a pick of my new striking cap gedore to assist in knocking the old drain tub out.@KC_Tool [External image (uploads.tapatalk-cdn.com), not copied]
[External image (uploads.tapatalk-cdn.com), not copied]
[External image (uploads.tapatalk-cdn.com), not copied]
[External image (uploads.tapatalk-cdn.com), not copied]
[External image (uploads.tapatalk-cdn.com), not copied]
Sent from my XT1254 using Tapatalk
rrich1 wrote:
8 hours ago, rrich1 said:Well made some progress the last two days. My dumpster finally arrived today. Able to get the room completely gutted. I got the new shower faucet installed. Still need to put in the supports though. With the master bath next to this room I was able to switch out the drain for a new push lock one. The master tub wouldn’t hold water anymore. Wife works tomorrow so I’ll be home with the kids. Hopefully I can get a friend over to get the drywall in. Had to put in a pick of my new striking cap gedore to assist in knocking the old drain tub out.@KC_Tool [External image (uploads.tapatalk-cdn.com), not copied]
[External image (uploads.tapatalk-cdn.com), not copied]
[External image (uploads.tapatalk-cdn.com), not copied]
[External image (uploads.tapatalk-cdn.com), not copied]
[External image (uploads.tapatalk-cdn.com), not copied]
Sent from my XT1254 using Tapatalk
That looks like tons of fun!!! Man I wish I could come help. Love those gedore’s getting some love! Can’t wait to see “after pics”.
KC_Tool wrote:
That looks like tons of fun!!! Man I wish I could come help. Love those gedore’s getting some love! Can’t wait to see “after pics”.
It would have been more fun if my dumpster had arrived when it should have. Was irritating not having it. I didn’t want to throw everything in the garage and then clean up that mess too.
The drain I tried to cut two slots into the top and then used the screwdriver with a hammer to twist it off. Instead it punctured the fitting making a hole. I was able to finally get it off. And replaced.
The tip still looks great. The striking cap though is heavily marked and scratched. Not sure if that is normal or not.
Sent from my XT1254 using Tapatalk
rrich1 wrote:
9 minutes ago, rrich1 said:The tip still looks great. The striking cap though is heavily marked and scratched. Not sure if that is normal or not.
Sent from my XT1254 using Tapatalk
Yeah… Striking caps are funny things. They do tend to show wear when used as intended, which is not always so aesthetically pleasing. You could try using a rubber mallet or a hammer with softer steel than the striking cap. However then the hammer would get dinged up. Catch 22… sorry man.
KC_Tool wrote:
Yeah… Striking caps are funny things. They do tend to show wear when used as intended, which is not always so aesthetically pleasing. You could try using a rubber mallet or a hammer with softer steel than the striking cap. However then the hammer would get dinged up. Catch 22… sorry man.
It isn’t a issue for me. Was more just curious. Thanks for confirming it for me.
Sent from my XT1254 using Tapatalk
rrich1 wrote:
15 minutes ago, rrich1 said:
It would have been more fun if my dumpster had arrived when it should have. Was irritating not having it. I didn’t want to throw everything in the garage and then clean up that mess too.
The drain I tried to cut two slots into the top and then used the screwdriver with a hammer to twist it off. Instead it punctured the fitting making a hole. I was able to finally get it off. And replaced.
The tip still looks great. The striking cap though is heavily marked and scratched. Not sure if that is normal or not.
Sent from my XT1254 using Tapatalk
Nice thing around me for some remodels if you can bag it and place a few bags out a week the garbage men will take it. It’s so nice on small jobs and saves some cash too dumpsters are expensive!! Even that waste management bagster isn’t cheap
rrich1 wrote:
1 minute ago, rrich1 said:
It isn’t a issue for me. Was more just curious. Thanks for confirming it for me.
Sent from my XT1254 using Tapatalk
Pristine tools are unused tools
DR99 wrote:
Nice thing around me for some remodels if you can bag it and place a few bags out a week the garbage men will take it. It’s so nice on small jobs and saves some cash too dumpsters are expensive!! Even that waste management bagster isn’t cheap
When we did our basement remodel a few years ago we out it out for the trash. I felt bad and didn’t put everything out at once so I sit it up. Was just a pain. Already very happy I got the dumpster. The expense was worth it. Think it set me back $325 for a 10yrd.
Sent from my XT1254 using Tapatalk
Yesterday was the last of my 4 days off. I was able to get a friend to come over late in the afternoon. We were able to get the ceiling drywall up as well as one other wall. The next wall I want to drywall has the toilet with the plumbing. I think I am going to cut off the shut off valve and replace it with a shark bite valve. That way I can take it off easily if needed. I will also get them for the sink as well.
I really wanted to have the drywall and cement boards up by today but that is ok. I dont feel like it is that far behind. My goal is to have it all up by the end of the month. Wife and I both work full time and two kids under 4 makes it hard sometimes to work full days. Piecing time in seems to be how it always is. My deadline to have it all done is Christmas eve.
For the people who do this for a living, do you always use drywall adhesive when installing drywall? The ceiling didn’t have it (no sagging issues that I saw) but the walls did.
im not a pro, but i have never used drywall glue.
what’s your stud centers, and thickness of the rock? (1/2” minimum)
phffter wrote:
im not a pro, but i have never used drywall glue.
what’s your stud centers, and thickness of the rock? (1/2” minimum)
16″ centers and 1/2 drywall. The walls had glue on them before and the ceiling didn’t.
Sent from my XT1254 using Tapatalk
kinda strange for the walls to bow, and not the ceiling to sag. moisture problem? bathroom vented to outside?
Wish I had the skills to redo our main bath. I did our 1/2 bath, and it was just short of a disaster lol. Looking forward to seeing update of your project.
WigWagWorkshop wrote:
2 hours ago, WigWagWorkshop said:Wish I had the skills to redo our main bath. I did our 1/2 bath, and it was just short of a disaster lol. Looking forward to seeing update of your project.
well it isn’t together yet lets not get ahead of ourselves! lol
Today I was able to get a few pieces of drywall up. I didn’t use any adhesive. My luck I would need to take a piece off for some reason and then be screwed. I also was able to get the shut off valves replaced on the tub and sink with shark bite valves.
Sent from my XT1254 using Tapatalk
Good progress so far, getting started is half the battle. I just put in an hour or so hauling rubble up from my basement stairs project. I get my p90x workout and then some ha
Good progress today. I had a friend come over and we were able to get most of the drywall up. We were able to get the tub drain into its position but I forgot to put adhesive on the tub feet. At this time we are not using mortar under the tub. The tub is basically completely level. The mortar i had bought to put underneath, I called the manufacturer to double check if it was the right stuff and she had no idea what I was even talking about. So she was clueless and no help. with the tub it I don’t feel any flex. The Lyons tub we got has 6 feet and super ridgid.
We were able to also get some cement board up as well above the tub.
In the next week I want the niche built and the rest of the drywall and cement board up. Next will be fixing the plywood by the toilet flange. Mudding after that and then to tile.
Sent from my XT1254 using Tapatalk
Sounds like you’ve got a lot of work done.
Bathrooms are always seems to be a pain to remodel but sure nice when done.
Anxious to see pictures of your remodel job
got the rest of the drywall around the door done and the filler piece of cement board on the back of the tub.
I tried to get some work done on the vanity today. I am doing tongue and groove doors and I am having the worst time getting the tongue milled to the right thickness. 🙁
rrich1 wrote:
14 hours ago, rrich1 said:got the rest of the drywall around the door done and the filler piece of cement board on the back of the tub.
I tried to get some work done on the vanity today. I am doing tongue and groove doors and I am having the worst time getting the tongue milled to the right thickness. 🙁
Yeah that sounds like a trick. Using a router?
I put a corner whirlpool tub in Thursday… It had about an inch of space from floor to underside of tub. This called for extra mortar
[External image (farm6.staticflickr.com), not copied]
..
[External image (farm6.staticflickr.com), not copied]
…
[External image (farm6.staticflickr.com), not copied]
..
This tub barely squeezed in here. They wanted it put in, then they want to run the tile up to the tub, that’s backwards thinking in my book… This place is just rediculous, it’s a owner builder and nothing went smooth on this job, so many change orders, he should have got a proper general contractor.
Of course there had to be a joist right under the drain and over flow, so hello offset piping
[External image (farm6.staticflickr.com), not copied]..
Basically nothing done today before work. I went I to town to return a few things for the remodel. Came home and did my first yard cleanup for the fall. I did get the supports for the shower tub fixtures up. They are not fastened down yet though. This new schedule of working at 3 really kills my working time at home.
Sent from my XT1254 using Tapatalk
Got a decent bit in before work this afternoon. I got the shower fixtures in line and screwed down . The cement board and drywall on that wall as well. I cut the hole for the niche as well. I am trying to get it all matched out so it aligns with the grout line but I doubt I will end up being that lucky. Should I not even worry about it? Im trying to limit my cuts on the tile. Anyways, here are pics to show where it is at.
[External image (uploads.tapatalk-cdn.com), not copied]
[External image (uploads.tapatalk-cdn.com), not copied]
[External image (uploads.tapatalk-cdn.com), not copied]
Sent from my XT1254 using Tapatalk
It’s coming along really nice
Thanks
Sent from my XT1254 using Tapatalk
Another pretty good day of work before work 🙂 lol. Got the niche framed into the wall. I got the rest of the drywall and cement board up as well. I did t cut the hole for the niche yet because I am being anal about the placement and want to make sure it is on a grout line. I tried to math and measure but that doesnt always work. I might just tape what I have and red guard. Then when I start to tile cut the hole for the niche. And then water proof it. I used pocket holes for the supports so I could move them if needed. Also did a very needed tool and dust cleaning from the room. Next step is to replace any part of the sub floor that is needed.
[External image (uploads.tapatalk-cdn.com), not copied][External image (uploads.tapatalk-cdn.com), not copied]
Sent from my XT1254 using Tapatalk
I call it do it right; do it once, not anal ?
Today I got the 1/4″ piece in front of the tub replaced. I pulled the piece where the toilet is. The 3/4″is solid but has some mold. I am trying some stuff first and if that doesn’t work I might just replace it. That would mean replacing the toilet flange too. If I leave it I can just add a spacer or something else to bring it above the tile. I started to mud as well. Yup… definitely not a drywaller. Well see how this goes. Lol. Overall happy I got some stuff done today. One step closer.
Sent from my XT1254 using Tapatalk
Saturday- I was able to get all of the vertical joints taped and mudded.
I won’t be able to work on it until at least Monday. My plan/goal is to be able to tile in 2 weeks.
Sent from my XT1254 using Tapatalk
I didn’t get as far today as I wanted. We are not allowed to burn leaves in my town instead the village comes around with vacuum trucks and my street is collected on Monday. Got the yard cleaned up first.
In the bathroom I had to cut some supports for the ceiling between the joists where butt ends met. I was then able to get all of the ceiling taped and mudded except for the ceiling to wall joints.
I also put some mold killing primer around the toilet area. I’m still off on that and will most likely will just cut it out and replace the area allowing me to put a new flange in and up to the correct height without spacers. Still pondering that.
Overall progress is progress and now at work for the next 8. Yay no resting!
Sent from my XT1254 using Tapatalk
Good to hear! Just found this place to get toilet spacers(they go underneath the flange if the pipe has some flex available)
I think I want to get them for rough in plumbing and stick them under the flanges.
..
sounds like you have made progress. and seems your room has way more room than mine. bigger is better
rrich1 wrote:
7 hours ago, rrich1 said:I didn’t get as far today as I wanted. We are not allowed to burn leaves in my town instead the village comes around with vacuum trucks and my street is collected on Monday. Got the yard cleaned up first.
In the bathroom I had to cut some supports for the ceiling between the joists where butt ends met. I was then able to get all of the ceiling taped and mudded except for the ceiling to wall joints.
I also put some mold killing primer around the toilet area. I’m still off on that and will most likely will just cut it out and replace the area allowing me to put a new flange in and up to the correct height without spacers. Still pondering that.
Overall progress is progress and now at work for the next 8. Yay no resting!
Sent from my XT1254 using Tapatalk
Same here, we can’t burn in the village, might be an Illinois EPA thing, or crook county
JimboS1ice wrote:
Same here, we can’t burn in the village, might be an Illinois EPA thing, or crook county
Probably your county or village/city ordinance. Other small towns or in the country can burn.
Sent from my XT1254 using Tapatalk
phffter wrote:
sounds like you have made progress. and seems your room has way more room than mine. bigger is better
I don’t think it is very big. I think it is basically an 8′ x 9′
Sent from my XT1254 using Tapatalk
Got a good deal of work done today. I got all of the ceiling corners done as well as the outside corners between the tub and the toilet. Started to get a second coat on some of the other sections when I got a little too close to one of the outlets with the blade. Tripped the breaker and put 2 notches into the trowel. So tomorrow on the way home I need to buy a new one.
Sent from my XT1254 using Tapatalk
rrich1 wrote:
1 minute ago, rrich1 said:Got a good deal of work done today. I got all of the ceiling corners done as well as the outside corners between the tub and the toilet. Started to get a second coat on some of the other sections when I got a little too close to one of the outlets with the blade. Tripped the breaker and put 2 notches into the trowel. So tomorrow on the way home I need to buy a new one.
Sent from my XT1254 using Tapatalk
Ruined a tool aww…?
Buy a new tool yay!!?
KnarlyCarl wrote:
Ruined a tool aww…[emoji26]
Buy a new tool yay!![emoji4]
I had just bought that one so I don’t really get to upgrade anything. [emoji53]
Sent from my XT1254 using Tapatalk
Another busy day. Had a qualification day at the range in the morning then had to run some errands (check the new tool thread). I was able to get everything second coated today before I had to come to work for an extra shift on my day off. Goal is still to be able to tile if time allows in a week and a half.
Sent from my XT1254 using Tapatalk
Yesterday I was able to get a 3rd coat of mud on. The small wall between the toilet and tub will need another coat though. I can see the corner bead through the mud. not sure if I will be able to get rid of it though. Need to sand that and then I will put the ply down around the toilet and then tape the cement boards around the tub. might not get to it until Tuesday though.
Had a few hours today to work in the bathroom. I got the 3rd coat sanded completely. I was then able to get any spots filled like any bubbles or to even things out. Tomorrow I should be able to get that sanded and the plywood on. I think I will be able to get the tape on the cement board before church as well. After that is mortar on the cement joints and then waterproofing.
Sent from my XT1254 using Tapatalk
rrich1 wrote:
5 hours ago, rrich1 said:Had a few hours today to work in the bathroom. I got the 3rd coat sanded completely. I was then able to get any spots filled like any bubbles or to even things out. Tomorrow I should be able to get that sanded and the plywood on. I think I will be able to get the tape on the cement board before church as well. After that is mortar on the cement joints and then waterproofing.
Sent from my XT1254 using Tapatalk
Nice, don’t rush the waterproofing stage, of course…..
KnarlyCarl wrote:
Nice, don’t rush the waterproofing stage, of course…..
For sure. Going to double check everything before I mortar the fiber tape as well
Sent from my XT1254 using Tapatalk
Between yesterday and today I got some stuff done. I got the last bit skim coated and sanded. I cleaned up any places where i dripped mud and vacuumed the walls and floor. I used fiber tape on the cement boards and also put mortar along all the seems (except the ceiling) and on the screws. I also got the last pieces of replacement underlayment on. I decided to keep the old flange and put in spacers.
On the vanity I was able to get the face frame glued and screwed in. Next on that is to make the innards.
Haven’t done anything in the bathroom the past few days. Today I did get a ton of work done on the vanity today. I haven’t posted any pics so here they are. Today I was able to get the insides of the vanity in. I still need to make the bottom shelf bit otherwise the main body is ready for stain and finish.
[External image (uploads.tapatalk-cdn.com), not copied]
[External image (uploads.tapatalk-cdn.com), not copied]
[External image (uploads.tapatalk-cdn.com), not copied]
[External image (uploads.tapatalk-cdn.com), not copied]
[External image (uploads.tapatalk-cdn.com), not copied]
Sent from my XT1254 using Tapatalk
[External image (uploads.tapatalk-cdn.com), not copied]
[External image (uploads.tapatalk-cdn.com), not copied]
[External image (uploads.tapatalk-cdn.com), not copied]
Sent from my XT1254 using Tapatalk
wow! building the vanity. very nice. you win!
need a seperate build thread!
i wish i had the time to build one myself, i dont.
plus the 2 animals i call sons will phuck it up (unintentionally) in short order
phffter wrote:
wow! building the vanity. very nice. you win!
need a seperate build thread!
i wish i had the time to build one myself, i dont.
plus the 2 animals i call sons will phuck it up (unintentionally) in short order
Haha. I’ve two kids (4 and 2). I started the vanity last month. The doors and drawer front have been giving me fits for a while. Those can be done after it is installed. This is a first for me and. Really enjoying it. I thought about it and I think I will make a separate build thread in the wood working forum. Thanks for the kind words.
Tomorrow I hope to get the lighting measured out and installed. My neighbor is going to wire everything up for me. Then I can paint the ceiling and walls most likely Tuesday. With Thanksgiving this week it messes up me possibly trying to tile this week. If not it will be next week for sure.
I am wanting to waterproof the tub area. But I still haven’t cut out my niche. Should I just not worry about where my limes will end up being at and do it or worry about trying to get it lines up with grout lines?
Sent from my XT1254 using Tapatalk
my sons are 27 and 24. yours are still young. mine should know better.
lines……………. depends. i spent alot of time on both baths with the soffits, so i would have an unbroken line and uncut tiles, from floor to ceiling, along the outside edge of the tub, front and back. upstairs i was dead nutz on. this one, im a little out in the back. dont know how, everything is square. i dont think it will that that noticeable.