Electrical Work this Morning

Archived from the Tools In Action forum (Around The House). This thread is read-only.

Justin HernandezMember since Apr 2015

Scope of work, change rotted down pipe wire was exposed, install low voltage bonding bridge, install water ground with bonding jumper for previous water softener. Dig a huge 4 foot deep hole which is not easy here in Florida. New number 6 ground wire, replace second ground rod which was rotted out but looks like someone cheated and just used a small piece code is two 8 foot ground rods spaced at 6 feet apart. Pull permits and call in for inspections there is 3 inspections needed for this little job.  

 

You are the influencer. Post it to 4.4 million followers.

Hit record. We’ll handle the rest.

Upload your review