Bigmikez wrote:
5 hours ago, Bigmikez said:
I’d come over to help Mike but my last boss canned me….don’t know why ?
Looks like your going to have fun with this though bro!!!!
ChrisK wrote:
4 hours ago, ChrisK said:
Bahahhhahahahhah!! ??? bro I’d still have you over anytime man!! Hopefully today I’ll get a lot done ✅
Welcome to my everyday life. I have come to realize that remodeling is more problem solving then anything else.
Bigmikez wrote:
7 hours ago, Bigmikez said:
Mike that looks awesome! What color of grout are you owing for this one?
Mike that looks awesome bro! Great job dude ?
Dude !!!!! Looks great … you got skillz
Nice work Mike
regopit wrote:
14 hours ago, regopit said:Nice work Mike
Means a lot coming from you bigman! Thank you!
Welcome to the forum.
For sure, seek professional mental help if considering undertaking these projects.
Just wrapping my latest total home remodel project, including demolition to remove existing kitchen, bath, wall to wall tile, disintegrated cast iron under slab, all new supplies, drains, upgraded wiring…
The results are amazing!
[External image (live.staticflickr.com), not copied]
[External image (live.staticflickr.com), not copied]
Before
[External image (live.staticflickr.com), not copied]
Fun Stuff:
[External image (live.staticflickr.com), not copied]
[External image (live.staticflickr.com), not copied]
[External image (live.staticflickr.com), not copied]
[External image (live.staticflickr.com), not copied]
Looks awesome. The best part is you can kick back and have an awesome feeling knowing you did all that. Very cool.
Nice work!
okpermanent wrote:
21 hours ago, okpermanent said:Just got done a Master Bath remodel. Gutted everything to the studs. There was 3 floors all built on each other that had to be broken out. Installed a new window. Built in a bench in the shower. Insulated everything. Re-did all the electric, added outlets, lighting. Had to repair some rotted wood. Install new electric baseboard heater. Moved plumbing from one side of existing shower to the other side. Tiled the entire bathroom. Full tile in shower and half wall outside of shower. Still waiting for frameless doors to come in. New toilet, vanities, sink. And I would say I lost roughly a week between the plumber doing his work and the drywall guys doing their work. My wonder is how long it normally would take to do this job completely. I did it by myself 75% of the time and the rest of the time I had a helper to do some things that didn’t require any skill. It took me exactly 4 weeks. Bathroom is roughly 11′ deep and about 6 foot wide with the first 3 feet of it only 3 foot wide (basically a little walkway into the room). Is that way too long or am I on pace. If that’s way too long, what can I do scheduling wise to make the next one go faster.
Bathrooms are next on my list. I have two bathrooms: the master bath has a vanity in the bedroom itself, and the main bath has a long (84″ or so) counter with one sink. Each has a separate tiny toilet/tub area. There is enough room to stand and if you move your legs you can even shut or open the door if on the toilet.
I don’t mind the small spaces for the toilets and tubs; I’m thinking about getting showers installed, which should open them up a little, but I honestly don’t need a whole lot of space there. I’ll probably go with dual sinks for both bathrooms, tile flooring, and redo the walls.
Once I confirm my tax exemption is permanent, I plan to add a bathroom in what is now the garage. I have built-in double and single garages, so about 600 s.f. of living space can be added, which will increase the assessed value and would raise my property taxes if Ihave to pay them (not a big deal, but if my VA rating exempts me, I’m not offering more of my money to the government). That bathroom will probably be a bit larger than the two I have now.
If you do this for a living, it may be a little long. If this is not your full-time job, then I would say you jammed out. That is about the size of my bathroom and I feel like the smaller bathrooms are harder than the larger bathroom, more cutting and hard to move around. Mine took about 7 weeks and I did the same in regards to moving pipes and electric. It’s hard to work all day and then come home and get a good time in to get things done. Plus on the weekends, I had baseball with the kids.
A buddy always gives me a hard time with how long it took me to gut my house and put on an addition but if it’s not your full-time job,time is limited.
Eric – TIA wrote:
On 8/7/2023 at 2:39 PM, Eric – TIA said:If you do this for a living, it may be a little long. If this is not your full-time job, then I would say you jammed out. That is about the size of my bathroom and I feel like the smaller bathrooms are harder than the larger bathroom, more cutting and hard to move around. Mine took about 7 weeks and I did the same in regards to moving pipes and electric. It’s hard to work all day and then come home and get a good time in to get things done. Plus on the weekends, I had baseball with the kids.
A buddy always gives me a hard time with how long it took me to gut my house and put on an addition but if it’s not your full-time job,time is limited.
Same as me, I don’t fit in small bathrooms loooooool
Sorry, wish I could help but don’t know enough about them to provide any feedback.